菠菜网app下载游戏菠菜网

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully
Release time: 2020-11-6

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully.

The project from the start to smooth delivery, Ritai valves closely cooperate with all departments, strictly control the technology, procurement, quality, production, inspection and other key links.Under the witness of the owner, all the valve products passed all the tests once and successfully passed the acceptance and appraisal.


Project Background: Tabella T4 hydropower Station is reputed as "The Three Gorges Project of Pakistan". After completion, tabella Dam will expand capacity by 1410MW on the basis of the current capacity of 3478MW.As an important livelihood project in Pakistan, The Tabella T4 hydropower Station has been highly concerned by people from all walks of life in Pakistan.



+86-21-59170106
qrCode
999白菜彩金论坛2019,白菜网送彩金网站大全,002cc全讯开户送白菜 一个真正注册送38元,2021注册送白菜免费网址大全,吉祥虎白菜彩金网论坛 800cc全讯白菜网,999论坛白菜大全网站多少,百富论坛白菜网址 电子老虎机送体验金,新会员充值送彩金平台,网站注册送37元 999白菜彩金论坛2019,冠军论坛白菜大全cmp,新人注册送38元 博一吧论坛白菜,新用户注册领取体验金,免费白菜体验金论坛